Dore & Totley Park & Ride car park closure

Network Rail will be carrying out essential engineering works to maintain the safe and reliable operation of the railway line. Works involve replacing the bridge structure and track over the River Sheaf, located near Dore & Totley Station, from Monday 28 September 2026 until Friday 4 December 2026 during the following hours:

  • Monday to Friday: 07:00 to 17:00 each day
  • Saturday night shifts throughout September, October, November and December: 23:00 to 07:00
  • Friday 6 November 23:00 to Monday 9 November 06:00

Car park restrictions

To facilitate this work, the Dore and Totley Station car park will need to be temporarily closed. Key project dates and car park arrangements are shown below:

  • Alternative parking: Available at Abbeydale Sports Club from 28 September 2026 to 3 December 2026.
  • Partial car park closure: 28 September 2026 to 11 October 2026.
  • Full car park closure: 12 October 2026 to 27 November 2026.
  • Partial car park closure: 28 November 2026 to 3 December 2026.
  • Full reopening of the car park: Friday 4 December 2026.

Alternative parking will be available and clearly signposted at Abbeydale Sports Club, Abbeydale Road, Sheffield, S17 3LJ, with designated spaces provided near Abbeydale Badminton Club. In addition, accessible drop-off, laydown and pick-up points will be available on Ladies Spring Grove during the closure.

Alternative car parking spaces at Abbeydale Sports and Social Club outside Abbeydale Badminton Club

Alternative car parking spaces at Abbeydale Sports and social Club outside Abbeydale Badminton Club

Designated parking spaces outside Abbeydale Badminton Club

Designated parking spaces outside Abbeydale Badminton Club

While the station car park is closed to the public, both platforms will remain open and fully accessible. Clearly signposted diversion routes will be in place to guide pedestrians safely around the works.